Sector Expertise

Breadth of experience,
tailored to the matter.

We deploy a rigorous forensic methodology to establish causation and evidence entitlement across all major environments in the UK.

DOMAIN.01

Prime Residential

Extensive forensic experience representing UHNW individuals and major UK residential developers on complex, high-value claims, including matters exceeding £100m.

High-Rise Developments
Basement Excavations
Facade & Cladding Issues
Luxury Fit-Outs
STRUCTURAL_ANALYSIS: PRIME RESIDENTIALREF: UHNW_01GROUND_LVL+20m+40m-10m-20mFIT-OUT_DELAYFACADE_DEFECTVALUATION METRICSBASE CONTRACT£45.2MVARIATIONS (FIT-OUT)+£18.5MPROLONGATION+£6.1MTOTAL CLAIM£69.8M
DOMAIN.02

Infrastructure

Definitive quantum modelling and forensic delay analysis across tier-1 infrastructure programmes and major works.

Highway Networks
Aviation Expansions
Bridges & Tunnels
Public Realm Works
DELAY_ANALYSIS: AVIATION EXPANSIONSYS: TIER1_INFRAINTERFACE_CLASHIMPACT: +42 DAYSTERMINAL_02NETWORK_STATUSON_SCHEDULECRITICAL_DELAY
DOMAIN.03

Rail Networks

Strict entitlement analysis and loss and expense recovery within complex rail networks and major supply chains.

Rolling Stock Facilities
Signaling Upgrades
Station Developments
Track Renewals
LOSS & EXPENSE: RAIL NETWORKSSYS: SIG_UPGRADESIG_1ASIG_2ASIG_3APOSSESSION_OVERRUNTIMEPLANNED_COSTLOSS & EXPENSE TRIGGER
DOMAIN.04

Civils & Earthworks

Forensic valuation and definitive entitlement analysis across complex civils scopes, contract change, and sequence disruption.

Deep Foundations
Subterranean Works
Ground Conditions
Water Management
GEOTECHNICAL_FORENSIC: CIVILS & EARTHWORKSSYS: STRATA_04WATER_TABLEUNFORESEEN_OBSTACLEDELAY_CAUSATION: TRUE-0m-10m-20m-30m
DOMAIN.05

M&E Systems

Rigorous commercial strategy and forensic analysis of delay and thickening across complex mechanical and electrical scopes.

HVAC Installations
Building Management
Life Safety Systems
Commissioning Delay
SCHEMATIC: M&E COMMISSIONINGSYS: BMS_HVACAHU-01VAV-1ZONE-AVAV-2ZONE-BCOMMISSIONING_FAILUREINADEQUATE_PRESSURESYSTEMS_READOUTSTATIC_PRESSURE120 Pa (FAIL)FLOW_RATE1.2 m3/sCOMPLETION
DOMAIN.06

Energy & Power

Exhaustive claims strategy and quantum of damages support for power-related works, where robust evidential records matter.

Substation Builds
Renewable Generation
Grid Connections
Transmission Networks
QUANTUM_DAMAGES: ENERGY & POWERSYS: GRID_SYNC_FAILRENEWABLE_GENSUBSTATIONGRID_FREQUENCY_SYNCSYNC_FAILURE_EVENTLOST_REVCAPACITY_CURTAILMENT-42.5 MWDELAY_DURATION114 DAYSQUANTIFIED_DAMAGES£14.2M
Initiate Process

Discuss your matter

If you're facing a high-value dispute or need robust quantum support, we can help you assess the position and define the next steps.

Contact us